南京地鐵南北線一期工程XX標(南京站站)土建施工投標文件.doc
進入下載頁
南京站站(K14+91.35~K14+376.67)位于南京火車站地區,受地鐵南北向線路走向控制,該站自南向北,以80度角下穿既有鐵路站場,并在北端與地鐵四、五號線在南京火車站地區交匯。受鐵路站場分隔,該站主體結構分南區、北區和過站區三部分,其中南區、北區為明挖箱型框架結構,將分別與火車站房改造及未來京滬高速鐵路站房同步建設,過站區位于既有鐵路站場下,為暗挖隧道。
Nanjing Railway Station (K14 +91.35 ~ K14 +376.67) at Nanjing Railway Station, by the north-south subway line to control the station from south to north, 80 degrees beneath the existing railway station and subway in the north and Fourth, on the 5th line in the intersection of Nanjing Railway Station area. Separated by the railway station, the station of the main structure of sub-South, North Station area and had three parts, including Southern, northern cut and cover box for the frame structure, will house and train station and the future transformation of Beijing-Shanghai High Speed Railway synchronization station house building over the existing station located under the railway station, for the bored tunnel.
